SPEARMINT SCARF
© 2009 Judy Lamb
Materials: Sport Weight yarn (5 oz.), mint green; size 6 knitting needles; cable needle.
Finished Size: Approximately 6-1/2" X 42"
Cast on 38 sts. Knit 9 rows.
Next row: k7, M1,k2, M1, k20, M1, k2, M1, k7.
Follow graph below for 15 repeats, or until desired length, ending with row 23 on last repeat.
Next Row: K6, k2 tog, k2, k2 tog, k18, k2 tog, k2, k2 tog, k6.
Knit 8 rows.
Bind off knitwise.
Finished Size: Approximately 6-1/2" X 42"
Cast on 38 sts. Knit 9 rows.
Next row: k7, M1,k2, M1, k20, M1, k2, M1, k7.
Follow graph below for 15 repeats, or until desired length, ending with row 23 on last repeat.
Next Row: K6, k2 tog, k2, k2 tog, k18, k2 tog, k2, k2 tog, k6.
Knit 8 rows.
Bind off knitwise.
This graph was created using Knit Design Studio.
Note: On the graph, where there is a purl stitch indicated, those stitches will be knit on wrong-side rows.
Cables: Cable over 6 sts is worked as follows: Sl 2 sts to cable needle and hold in front, k4, then k2 from cable needle.
Cable over 8 sts is worked as follows: Sl 2 sts to cable needle and hold in front, k6, then k2 from cable needle.
Cables: Cable over 6 sts is worked as follows: Sl 2 sts to cable needle and hold in front, k4, then k2 from cable needle.
Cable over 8 sts is worked as follows: Sl 2 sts to cable needle and hold in front, k6, then k2 from cable needle.